• The probable frequency and probable magnitude of future loss [2]
• The potential of loss (an undesirable outcome; however, not necessarily so) resulting from a given action, activity, and/or inaction, foreseen or unforeseen
• A number of risk metrics are commonly applied, such as loss event frequency and probable loss magnitude [2]
• Furthermore, a distinction may be made between:
— Initial risk: before mitigation
— Residual risk: after mitigation