| Operational Linkage |
|
VSM Viable System (1).(1) |
VSM Viable System (1).(1) |
| Ressource & OpsRequirements |
|
VSM Viable System (1).(1) |
Mid Term Coordination (1).(3) |
| KPI & Target Achievement |
|
VSM Viable System (1).(1) |
Short Term Coordination (1).(2) |
|
|
VSM Viable System 1 (1) |
VSM Viable System (1).(1) |
| Operational Linkage |
|
VSM Viable System (1).(1) |
VSM Viable System (1).(1) |
| Targets & Budgets |
|
Mid Term Coordination (1).(3) |
VSM Viable System (1).(1) |
| inspect & adapt |
|
Mid Term Coordination (1).(3) |
VSM Viable System (1).(1) |
| Task Regulation |
|
Short Term Coordination (1).(2) |
VSM Viable System (1).(1) |